at Cedar Point

Top Thrill 2 Construction Timeline

Cedar Point Historical Photos Taken: 10/29/2023 Posted: 03/30/2024

In this photo update, we share a collection of Top Thrill 2 photos showcasing the construction progress throughout the 2023 season. From mysterious footers in the Iron Dragon lagoon, to track installation, repainting and vertical construction, we share how this ride got reimagined.

For photos of the completed 420 foot spike, check out our Winter Chill Out 2024 photo update.


Top Thrill 2 at Cedar Point
The repainting of the top hat was performed by Baynum Solutions.


Vejas

Vejas

Hello, I created Theme Park Archive. I enjoy sharing photos, videos and stories from my theme park adventures with others.




Disaster Transport Last Day

Disaster Transport Last Day

Photo Updates Cedar Point 49 Photos Posted: 05/14/2013

Cedar Point Winter Chill Out 2014

Cedar Point Winter Chill Out 2014

Photo Updates Cedar Point 200 Photos Posted: 02/24/2014

What's new at Cedar Point in 2023

What's new at Cedar Point in 2023

Photo Updates Cedar Point 113 Photos Posted: 05/07/2023




Top Thrill 2 - Cedar Point
Date Taken: 07/16/2023
Date Posted: 03/30/2024